Edison Science Building Renovations
Psychology Observation Lab
The first phase of the Edison Science Building Renovation Project consisted of a complete upgrade of the second floor classroom and office areas housing the departmenta of Chemistry, Medical Technology, and Physics, and the Department of Biology. This upgrade included: new lab casework; lab air, water, and gas distribution; two new air handling systems installed in the Edison boiler room; and a new chiller plant installed at the link mechanical room. This work was performed during the summer of 1997.
The second phase of the Edison Science Building Renovation Project consisted of a complete upgrade of the first floor and basement classroom, office and lab areas housing the departments of Biology, Chemistry, Medical Technology and Physics; Electronic Engineering; and Psychology. This upgrade included new lab casework, new air distribution and exhaust systems, and telecommunications and electrical upgrades. This work was performed during the summer of 1998.